<%@LANGUAGE="VBSCRIPT" CODEPAGE="1252"%> <% 'The following three lines of code are used to make sure that this page is not cached on the client. Response.CacheControl = "no-cache" Response.AddHeader "Pragma", "no-cache" Response.Expires = -1 if session("UID")="" then Response.Redirect "Logon.htm" Response.End end if %> Vivace E-business Showcase

 

Project technical report:
Baron H. W. (2006), "Evaluation and selection of software systems for the implementation of a methodology for the process chain evaluation". VIVACE 2.5.4 report, WP2.5/4/MTU/T/06045-1.0.

Project technical report:
Baron H. W. (2006), "Ideal workflow and process chain planning concept and methods based on development and production planning parameters and database". VIVACE 2.5.4 report, WP2.5/MTU/T/06041-1.0.

Further Reading
The following documents may be of interest, for further study...

Project progress report:
Baron H. W., Müller S. (2004), “"Production process evaluation at MTU“, VIVACE 2.5.4 report.

Project technical report:
Baron H. W. (2005), "Current practice, possible improvements and the user dependent requirements on methods and tools for workflow and process chain evaluation". VIVACE 2.5.4 report, WP2.5/4/MTU/T/05028-2.0.